If you are selecting central air conditioning duct cleaning equipment, the first step is to determine the working method based on duct configuration. For large main ducts where a robot can enter and move inside, the KT-976 Duct Cleaning Robot sh...
VIEW MORE
When a crystallization evaporator experiences pipe blockage—especially severe diameter reduction or complete blockage caused by hard crystallized scale—the first step is to determine the deposit characteristics, pipe material, and blockag...
VIEW MORE
When an ammonia evaporator becomes blocked, equipment selection should be based on blockage severity, deposit characteristics, tube material, and cleaning accessibility. For deposits that can be treated with suitable chemical agents, chemical cleanin...
VIEW MORE
When a tunnel embedded pipe becomes blocked, the first step is to determine whether the blockage is debris, pipe deformation, or hardened concrete/cement slurry. If hard concrete blockage is confirmed and the pipe itself is not severely deformed, mec...
VIEW MORE
When a multi-effect evaporator heat exchanger experiences material blockage, the first step is to determine whether the blockage is ordinary deposition, crystallization scaling, or material that has hardened and completely sealed the heat exchange tu...
VIEW MORE
When a triple-effect evaporator tube bundle becomes blocked, the first step is to determine whether the blockage consists of salt crystallization, scale, material deposition, or composite hard fouling. For tubes that are not completely blocked, chemi...
VIEW MORE
When a continuous beam corrugated duct is blocked by cement slurry, mortar, or hardened concrete, the first step is to determine the blockage location, blockage severity, and whether steel strands have already been threaded through the duct. For hard...
VIEW MORE
The KT-101 Portable Central Air Conditioning Pipeline Cleaning Machine is primarily used for cleaning small-diameter heat exchange tubes in condensers, refrigeration units, heat pump units, heat exchangers, and oil coolers. For internal dep...
VIEW MORE
When a tunnel crossing conduit is blocked by concrete, the first step is to confirm the conduit inner diameter, blockage location, blockage length, and concrete hardening degree. For hardened concrete blocks that standard cable pullers cannot pass th...
VIEW MORE
If you need to clean central air conditioning condensers, chillers, or heat exchangers—and your projects involve large tube bundle counts, high cleaning frequency, and long continuous operating hours—then equipment selection should focus ...
VIEW MORE
When a wind turbine foundation embedded cable conduit becomes blocked by concrete, if the blockage is only minor debris, conventional tools such as cable pullers can be tried first. If a hard concrete block has formed inside the conduit and standard ...
VIEW MORE
If central air conditioning condenser cleaning requires not only removing scale, rust, and slime from inside the heat exchange tubes but also flushing the equipment surfaces—and on-site fixed water supply is inconvenient—then a combined "...
VIEW MORE